您好,欢迎访问重庆液压升降机械销售中心官网!

重庆液压升降机械销售中心

 多年以来一直专注于生产销售液压升降机械设备

全国24H热线服务电话:

152-5313-4653

您当前的位置 :首 页 > 客户案例 > 固定升降机钢管如何进行安装?

固定升降机钢管如何进行安装?

2022-11-15 09:57:38
399次

1、检测固定升降机http://www.jnyuexiang.com/管子的质量,要查明固定升降机钢管材料、尺度和质量是不是符合规划规则;查看固定升降机管子外观是不是有严重压扁或曲折,查看固定升降机管子内外壁表面上是不是有腐蚀表象,外壁是不是有裂纹等缺点。
Quality testing fixed lift tube, to identify a fixed lift steel materials, scale and quality is not consistent with the planning rules; see the fixed lift tube appearance is not a serious crush or tortuous, look at the inner and outer wall surfaces of the pipe is not fixed lift corrosion appearance, the outer wall is not a drawback crack.

2、安装固定升降机钢管管道必须按规划图纸或实际测量合理安置,安装时对固定升降机钢管接头、法兰件都要进行质量检测,发现如有缺点,接头、法兰件都禁止运用,应替换,并用火油清洁和用气吹净。
Mounting lift steel pipes must be reasonable planning drawings or actual measurement placement of fixed lift pipe fittings, flanges, parts quality testing should be carried out during installation, if any shortcomings found, fittings,flanges, prohibit the use of parts should be replaced with Oil and gas blowing clean.

3、固定升降机http://www.jnyuexiang.com/钢管安装时对现已酸洗过的管子要用气吹净,对已就位的固定升降机钢管液压阀台、液压泵站、主机、辅机及有关部件的方位应谨慎丈量、力求精确,对接头之间曲折部位较多、形状杂乱的管子要先做一个样板,然后按尺度或样板切开管子。
When the pipe is installed on a fixed lift pickled now use gas blow pipe, already in place for fixed steel hydraulic valve lift station, orientation pump stations, main engine and related components should be carefully measured, and strive to accurately of twists and turns between the joint parts are more messy tube shape to do first a model, and then press the scale or template to cut the pipe.

快速导航

· 产品展示                · 客户案例              

· 厂容厂貌                · 新闻动态              

· 行业知识                · 常见问题             

· 关于悦翔                · 联系我们             

联系我们

公司名称:重庆液压升降机械销售中心

联系人:安经理

电话:152-5313-4653

邮箱:347299818@qq.com

地址:重庆市经济技术开发区

手机移动端

微信扫一扫